Project strategies
The RIBA Plan of Work 2013 defined Project Strategies as:
|
The strategies developed in parallel with the Concept Design to support the design and, in certain instances, to respond to the Final Project Brief as it is concluded. These strategies typically include:
These strategies are usually prepared in outline at Stage 2 and in detail at Stage 3, with the recommendations absorbed into the Stage 4 outputs and Information Exchanges. |
The RIBA Plan of Work 2020 defines Project Strategies as:
|
Strategies to support the design process, generally developed in parallel with the
These strategies are usually prepared in outline at Stage 2 and in detail at Stage 3, |
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.
CIOB announce the winners of the Art of Building photography competition.
National Scheme of Delegation introduced.
The cost of employing people remains a concern.
Code of Practice for Electrical Energy Storage Systems.
ECA calls on members to comment on draft 4th edition.
Bringing together expertise and creating cultural benefits.
CIOB celebrates positive Ofsted report.
The Building Safety Regulator announces a call for evidence.
Government approach could undermine delivery and regeneration.